Skip to main content
2019 Annual Report
Text
Size
2019 Annual Report

2019 Annual Report

Diversification
and Efficiency

In 1944, President Roosevelt ordered the U.S. Navy to construct Pipeline 1, connecting the Colorado River Aqueduct in Riverside County to San Vicente Reservoir.

8.

Increasing Water Supply Reliability through Supply Diversification

A chart reading 'Water Authority Service Area Fiscal Year 2019 Demand and Supply' | 133 TAF at 29% - Metropolitan Water System | 113 TAF at 24% - Imperial Irrigation District Transfer | 79 TAF 17% - All American & Coachella Canal Lining | 46 TAF 10% - Seawater Desalination | 36 TAF 8% - Local Surface Water | 25 TAF 5% - Groundwater | 22 TAF 5% - Recycled Water | 9 TAF 2% - San Luis Rey Water Transfer | TAF=Thousand Acre-Feet