Miramar Hill to Scripps Ranch Relining Project

About This Project

This project is part of the San Diego County Water Authority’s pipeline relining program, which rehabilitates and extends the life of aging water delivery pipelines. The relining process involves inserting steel liners into existing pipelines to reinforce them to prevent water leaks and breaks. This helps ensure a safe and reliable water supply for our region’s future.

 

ABOUT THIS PROJECT - DETAILS
 

This Project

All relining work is conducted in segments based on the age of the pipelines and the need for improvements. The Miramar Hill to Scripps Ranch Relining Project will rehabilitate approximately 3.25 miles of two of the Water Authority's pipelines that traverse portions of the Mira Mesa and Scripps Ranch communities.

This project will have five scheduled pipeline shutdowns, which will require 24-hour construction work and activities. Like relining work during normal working hours, most of the shutdown work and activities will take place underground, within the pipelines. The Water Authority will minimize noise and light disruptions to project neighbors, as much as possible, by pointing lights downward and installing sound walls at each of the portal locations. The shutdowns are necessary to keep untreated imported water flowing to member agencies, such as the city of San Diego, during construction. These shutdowns will not affect delivery of water to your home or business. Please see the schedule and portal location map, below, for more information.

In 2005, the Water Authority performed similar work in the Scripps Ranch community when they relined Pipeline 4 from Red Cedar Drive south to State Route 52.Two existing small pipelines will be replaced with one larger pipeline. Nearly one mile long, the new pipeline will be constructed in a tunnel and will be able to deliver larger quantities of untreated water. A majority of work on the tunnel and new pipeline will take place underground in Mission Trails Regional Park, just east of the community of Tierrasanta in the city of San Diego.

 

 

Back to top

SCHEDULE
 
Construction begins August 2011
24-hour work (Shutdown 1) December 4-13, 2011
24-hour work (Shutdown 2) January 8-17, 2012
24-hour work (Shutdown 3) March 18-24, 2012
24-hour work (Shutdown 4) May 13-19, 2012
24-hour work (Shutdown 5) July 22-28, 2012
Construction ends Late 2012

*All dates are approximate and subject to change.

 

Completed Milestones

Completion of Project Design Early 2011
Periodic site visits and environmental surveys Fall 2008 – Summer 2011

Final Mitigated Negative Declaration adoption by Water Authority Board of Directors 

February 26, 2009

Draft Mitigated Negative Declaration distributed for public review

Late 2008 

 

 

Back to top

MAP
 
Portal Location Map
Orange boxes indicate locations of portals within Mira Mesa and Scripps Ranch communities

 

 

 

 

 

 

 

 

 

 

 

Back to top

MULTIMEDIA
 
 

Photos


Trucks carrying steel liners for a previous relining project
 

Videos

Introductory video about the Water Authority's pipeline relining program.

 

Other

There is no other Multimedia for this project


Caption
 

Back to top

PUBLICATIONS
 
COMMUNITY OUTREACH
 
Homeowner Association Presentations:
  • Nob Hill HOA  (February 17, 2011)
  • Nob Hill HOA  (November 17, 2010)
  • Nob Hill HOA  (October 20, 2010)
  • Miro Ravel HOA  (May 4, 2010)
  • Scripps Westview HOA  (April 15, 2010)
  • Scripps Ranch Townhomes HOA  (April 13, 2010)
  • Scripps Ranch Villages HOA  (April 8, 2010)
  • Nob Hill HOA  (April 8, 2010)
  • Miro Ravel HOA  (April 6, 2010)
  • Terraces at Scripps Ranch HOA  (April 5, 2010)
  • Affinity HOA (March 16, 2010)
  • Nob Hill HOA (March 12, 2010)
  • Affinity HOA  (February 25, 2010)

 Community Planning Group Presentations:

  • Scripps Ranch Planning Group (July 7, 2011)
  • Scripps Ranch Planning Group (February 3, 2011)
  • Scripps Miramar Ranch Planning Group (November 5, 2009)
  • Scripps Miramar Ranch Planning Group (November 5, 2009)
  • Scripps Miramar Ranch Planning Group (February 5, 2009)
  • Miramar Ranch North Planning Committee (February 3, 2009)
  • Mira Mesa Community Planning Group (January 20, 2009)
  • Miramar Ranch North Planning Committee (December 2, 2008)
  • Mira Mesa Community Planning Group (November 17, 2008)
  • Scripps Miramar Ranch Planning Group (October 2, 2008)

 

 

Back to top

ENVIRONMENTAL DOCUMENTS
 

Click here to view the report and other environmental documents for this and other projects.

Back to top

CONTACT INFORMATION
 

For more information, please call the 24-hour toll-free project information line at (877) 682-9283, ext. 7005 or email CIPinfo@sdcwa.org. A representative from the project team will return your inquiry within one business day.