Mission Trails Flow Regulatory Structure II, Pipeline Tunnel and Vent Demolition Project

Environmental Documents

These documents are available using Adobe Acrobat Reader. If you do not already have Adobe Acrobat Reader installed on your computer please download it here.

Free Adobe Acrobat Reader Download

NOTE: Portions of the appendices contain large amounts of data that may be slower to download when viewing with a dial-up connection.

Notice of Preparation, April 5, 2005
Notice of Availability - March 24, 2006
Environmental Findings of Fact and Statement of Overriding Consideration
Mitigation Monitoring and Reporting Program
 

VOLUME I, DRAFT EIR/EIS

Cover
Table of Contents

Executive Summary

1.0 Introduction
2.0 Project Description
3.0 Environmental Analysis

3.01 - Land Use
3.02 - Aesthetics/Visual Quality
3.03 - Traffic/Circulation
3.04 - Air Quality
3.05 - Noise & Vibration
3.06 - Recreation
3.07 - Water Resources
3.08 - Biological Resources
3.09 - Cultural Resources
3.10 - Geology & Soils
3.11 - Paleontological Resources
3.12 - Public Safety & Hazardous Materials
3.13 - Utilities & Public Services

4.0 Cumulative Impacts
5.0 Growth Inducing Effects
6.0 Other Mandatory Considerations
7.0 Alternatives
8.0 Organizations & Persons Consulted
9.0 List of Preparers
10.0 References

Volume II, Technical Appendices  

A - Notice of Preparation and Comment Letters

B - Traffic Technical Report
Appendices to the Traffic Technical Report

C - Air Quality Technical Report
Appendix to the Air Quality Technical Report

D - Noise and Vibration Technical Report

E - Biological Resources Technical Report
Appendices to the Biological Resources Technical Report

F - Cultural Resources Technical Report
Appendix to the Cultural Resources Technical Report

Volume III, Responses to comments

Cover
Table of Contents

1.0 Introduction to Final EIR

2.0 Responses to Comments

3.0 Errata

NOTE: Portions of the appendices contain large amounts of data that may be slower to download when viewing with a dial-up connection. Please contact the Water Authority's 24-hour toll-free project information line at (877) 682-9283, ext. 7004 to request a copy of any of the DEIR documents. Your call will be returned within one business day.