Pomerado Relining Project
Pipeline 4
|
Project Description
The San Diego County Water Authority is preparing for construction
on Pipeline 4 in the communities of Scripps Ranch, Pomerado and the Marine
Corps Air Station Miramar. The project consists of the installation of
a steel liner in 26,048 lineal feet of existing 69-inch, and 84-inch pipe
located in the Scripps Ranch area and on the Marine Corps Air Station
Miramar, specifically from Scripps Lake Drive south to the State Route
52 Freeway. Pipeline 4, together with Pipelines 3 and 5, form the Second
San Diego Aqueduct, one of two underground pipeline aqueduct systems delivering
water to San Diego County.
|
Current Project Schedule
Community Outreach Activities
Location of Construction Portals
Impacts to Miramar Ranch Elementary School
Environmental Documents
Contact Us
Contracting
Opportunities
Current
Project Schedule
October 2004 - May 2005
May 2005: project completed

|
Community
Outreach Activities
Project updates:
- Community Meeting Scripps Ranch Library Oct. 12 - Meeting
minutes
- Scripps Ranch Planning Group - Oct. 5
- Parent Meeting Miramar RAnch Elementary School - Sept. 14
- Scripps Ranch Planning Group - Aug. 5
- Community Meeting Scripps Ranch Library - July 21
- Scripps Ranch Planning Group - June 3
- Scripps Ranch Planning Group - May 6
- City of San Diego Water Department - Community Advisory Group
- Scripps Ranch Planning Group - March 4
- Public Hearing - April 22
Community notices:
|
Location
of Construction Portals
Relining work is conducted via 40-foot-long sections of pipe that are
excavated to gain access to the interior of the pipe and to introduce
relining materials. These construction portals will remain active for
approximately five months. Not all portals will be active
at the same time, however. Pipeline relining is done in several phases,
and work may shift from one portal to another depending on which phase
is under way.
In addition to the construction portals, other locations along the
pipeline will be used to support relining activities. Concrete, ventilation
and power may be introduced into the pipe at these locations. No excavation
will be necessary at these locations, which will be used intermittently
during the eight-month-long relining project.
| Scripps Ranch |
Portal 1 |
Scripps Lake Drive, east of Scripps Ranch Library |
| Portal 2 |
South of Red Cedar, parallel to Aviary Drive |
| Portal 3 |
South of Red Cedar in the vicinity of Jerabek Drive,
Aviary Court and Keman Lane |
| Portal 4 |
North of Pomerado Road in the vicinity of Waldgrove
Place and Tudor Street |
| |
Portals 5& 6 |
Deleted |
| |
Portal 7 |
On the Alliant University Campus, near the future
new Scripps Ranch Middle School |
| |
Portal 8 |
Deleted |
| Camp Elliott Miramar MCAS |
|
|
| Portal 9 - 20 |
MCAS |
| |
|
Impacts
to Miramar Ranch Elementary School
This project will impact Miramar Ranch Elementary School, as Pipeline
4 lies directly beneath school grounds. One of the construction portal
sites is located south of Miramar Ranch Elementary School, 200 feet south
of Red Cedar Drive within the existing easement. There will also be construction
activity on the school grounds surrounding a 30-inch-diameter man way
near the portable classrooms. There will be construction crews, equipment,
both air handling and concrete pumping units, concrete trucks, grouting
materials, and small trucks in this area. A sound wall will be built around
the structure to reduce the noise created to a level permitted under the
City of San Diego noise abatement ordinances. Work hours are currently
scheduled from 7 a.m. to 7 p.m. Monday through Friday. The Water Authority
is working closely with school officials and community leaders to minimize
the impacts of relining activities including noise, dust and traffic to
the school and the surrounding community.
Notice to Parents
- June 2004
Notice to Parents
- Sept. 2004



|
| Environmental
Documents
Notice
of Intent to Adopt a Mitigated Negative Declaration 
Draft Mitigated
Negative Declaration 
Draft
Initial Study 
Draft
Initial Study Checklist 
Traffic Study

Noise Study 
Biological
Technical Report 

|
Contact
Us
For more
information, please call the 24-hour toll-free project information line
at (877) 682-9283, ext. 7005 or email CIPinfo@sdcwa.org. Your